Our Activities

…equipment (upgrades, new branches, new beamlines). Installation and maintenance of vacuum systems and equipment across the facility (including bakeouts, leak detection tests, small repairing jobs and substitution of faulty parts)….

Beamline development collaborations

new beamlines at MAX IV. Such efforts significantly impact the development of the facility and once brought to realisation serve a broad scientific audience through open calls. MAX IV extremely…

Accelerator Documentation – peer reviewed articles

…Spectrometers, Detectors and Associated Equipment, Volume 806, 2016, Pages 221-230 Galina Skripka, Ryutaro Nagaoka, Marit Klein, Francis Cullinan, Pedro F. Tavares https://doi.org/10.1016/j.nima.2015.10.029 New features of the MAX IV thermionic pre-injector Nuclear…

Honeycomb borophene: myth or reality?

…Lyalin, A., Taketsugu, T., Vinogradov, N. A., & Vinogradov, A. S. Honeycomb Boron on Al(111): From the Concept of Borophene to the Two-Dimensional Boride open_in_new ACS Nano, 2021 10.1021/acsnano.1c05603 open_in_new

DUO account creation & login

To login or create a new account in DUO go to: https://duo.maxiv.lu.se/duo/ Already have a DUO account? If you already have an active DUO account, proceed to login by entering…

ForMAX

…multimodal structural characterization of hierarchical materials open_in_new J. Synchrotron Rad. 31, 363-377 (2024) https://doi.org/10.1107/S1600577524001048 open_in_new Introduction to ForMAX: https://www.youtube.com/watch?v=OyMf5ayqtbI ForMAX – Seminar on the Technical Setup and Research Methods: https://youtu.be/eqSc95DsFck…