Governance structure

…Doctoral Students. A number of other academic, industrial and other type of partners contribute as Associated Partners hosting the students for their secondments. On an operative level, the PRISMAS Project…

Prepare sample shipments with EXI at MAX IV

…right of the parcel pane and clicking on Remove, and finally reload the corrected CSV again. For more information about the contents and format of the CSV file, please see…

Survey, Alignment and Mechanical stability

The Survey, Alignment and Mechanical stability (SAM) team is crucial during the design and installation of every component at Max IV. Our work starts during the design of each component,…

Practical information

…turned off during weekends (Friday 15.00 – Monday 07.30). Fresh fruit Fruit is available free of charge on Mondays, Wednesdays and Fridays. There are fruit baskets are located in the…

Sample Environments

…by the beamline (staff) for your experiment. The second option for measuring samples in transmission geometry is a NanoMAX specific solution. These flat holders (“type B”) are made from Aluminum…

xrdPlanner: a new, versatile beamtime planner

…adapting to the user community’s needs. “We are looking forward to getting feedback from the user community. What features do users want or need? How can it be made more…

Science at DanMAX

…simplicity of the full-field tomographic imaging experiment allows for diverse sample environments, enabling the study of materials under various conditions. With the intense X-ray beam from MAX IV, this technique…