Our Activities

The main tasks of the vacuum team include: Conceptual design, procurement, test, installation and commissioning of vacuum related accelerator upgrades. Assistance with the design and implementation of new vacuum beamline…

Accelerator Documentation – peer reviewed articles

…Tavares, S.C. Leemann, M. Sjöström, Å. Andersson http://dx.doi.org/10.1107/S1600577514011503 Diffraction-limited storage-ring vacuum technology J. Synchrotron Rad., 21, 878-883 (2014) E. Al-Dmour, J. Ahlback, D. Einfeld, P.F. Tavares, M. Grabski http://dx.doi.org/10.1107/S1600577514010480 Magnet design

Electrical and Power Supply systems

The team has overall responsibility for all electrical systems at MAX IV, throughout the life cycle from design to operation and maintenance. Tasks in the team Design of electrical installations…

Prepare samples for the Sample Exchanger

…automatically assign the Unipuck positions into the ISPyB database. From SPINE Pucks to Unipucks chevron_right This section describes the procedure to transfer samples in SPINE Pucks to UniPucks. The picture…

Balder

…high brilliance from the 3 GeV storage ring in combination with the beamline design will allow for time-resolved measurements down to sub-second time resolution to be performed. The design of…

Soft X-ray Laser

…soft X-ray range. A Conceptual Design Study, funded by the Knut and Alice Wallenberg Foundation, MAX IV Laboratory, Uppsala University, Stockholm University, The Royal Institute of Technology (KTH), Lund University, …

APXPS

…with inert gas. SPECIES uses flag style samples with a modified thermocouple design. Users can request to have sample holders shipped to them in advance. Sample holder is compatible with…

Accelerator documentation

MAX IV Detailed Design Report Download MAX IV Detailed Design Report chapter 1.1 1.2 1.3 chapter 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 chapter 3.1 3.2…