MAX IV – Main

Fast Access returns! chevron_right Backed by popular demand, Fast Access beamtime officially returns at MAX IV. Fast Access (also known as “Rapid Access”) is intended for projects that require quick…

MAX IV involvement in European projects

The active participation of MAX IV in a number of international networks and the networking efforts of the facility staff to exchange knowledge with peers in their field from foreign…

Data Access

…where #### is a sequential number. It is important to keep track of this number and the corresponding sample/experiment, e.g. by using the elogy logbook (https://elogy.maxiv.lu.se). The scan-####.h5 file is…

Coincidence Spectroscopy

…and reaction dynamics. Since its conception in the mid 1960’s, the coincidence technique has undergone considerable development and today a number of different spectrometers exist that enable the coincident measurement…

A record year for research at MAX IV

…proposals from national and international researchers who applied to use MAX IV this autumn. The total number of proposals submitted in the 2023 Open Calls (717) was 14% higher than…

Open Day

…for everyone curious about MAX IV. The next Open Day at MAX IV will be September 21, 2024 from 9:00 to 16:00. Tickets for Open Day are free of charge…

Surface & Material Science branch

…depending on the temperature range of an experiment: 1. Mo-based manipulator head for better heating. Radiative heating by filament (up to 800 °C), e-beam heating (up to 1200 °C, but…

Beamline optics

…on resolution/spotsize Energy resolution 1meV at 21eV, 2meV at 63eV (measured, 800L/mm, 20μm exit slit) Gratings All user beamtimes so far have operated on a single grating (800 L/mm cPGM)…

TV Screen

Fast Access returns! chevron_right Backed by popular demand, Fast Access beamtime officially returns at MAX IV. Fast Access (also known as “Rapid Access”) is intended for projects that require quick…

Guides and Checklists

…permitted to handle some chemicals or gases in certain ways. If you are unsure, contact experimental safety to discuss possible ways forward. 4-6 weeks before beamtime: Samples in DUO (make…