Fast Access

…must be available during the measurements to consult about the ongoing measurements if necessary. The maximum number of shifts: 3 (12 hrs). Only mail-in samples, no access to premisses. Only…

Technical Infrastructure

The Technical Infrastructure team is part of Engineering II and is in charge of Cooling, Ventilation, Compressed air, Cryo and gas systems. The team supports the entire MAX IV laboratory…