ISSE Workshop 2024

…Sample environments at neutron scattering facilities Sample environments at synchrotron radiation facilities The realization of complex setups for the investigation of gaseous, liquid and solid samples in different physical and…

Fast Access

…for fast Access two weeks before the planned beamtime. Facilities available for FS and SE: High-Temperature (general purpose) Cell, High-Pressure Reactor, and FTIR Spectrometer at the Solid-Gas endstation Electrochemistry and Liquid…

Technical Infrastructure

The Technical Infrastructure team is part of Engineering II and is in charge of Cooling, Ventilation, Compressed air, Cryo and gas systems. The team supports the entire MAX IV laboratory…