A record year for research at MAX IV

…users. 40,250 hours of used beamtime.  +31% beamtime hours awarded to academic users through Open Calls.   14% of the beamtime connected with industry research.  834 paid proprietary beamtime hours.  64%…

Experimental station

…X95 rails and carriages and can be removed/replaced for other equipment if needed. DanMAX beam conditioning unit. Beam enters from the right sides. An evacuated flight tube is used for…

Microscope

…of this image. Right panel: height profile along the indicated line. Comparison between STM and ncAFM imaging/resolution Sample: SiC(0001), STM: Vbias = +1.25 V, It = 230 pA AFM: Vbias…

ISSE Workshop 2024

The ISSE workshop 2024 is the 12th meeting in a series, which was initiated by Michael Meissner in Berlin, 1999. The workshop is held under the patronage of the International…

Fast Access

…the High-Temperature Cell of the Solid-Gas Endstation is available for the SMS. No sample preparation is allowed. Only conductive samples are accepted. The samples must be shipped mounted or prepared

Technical Infrastructure

The Technical Infrastructure team is part of Engineering II and is in charge of Cooling, Ventilation, Compressed air, Cryo and gas systems. The team supports the entire MAX IV laboratory…