Calls

There were two open calls during 2023 for applications to PRISMAS during a time window of two months: March-April and September-October. The third call will be open in July-August 2024. During the calls,…

Governance structure

…Doctoral Students. A number of other academic, industrial and other type of partners contribute as Associated Partners hosting the students for their secondments. On an operative level, the PRISMAS Project…

Prepare sample shipments with EXI at MAX IV

…department (Godsmottagningen, phone number as written on the printed out dewar labels) know that your dewar is ready for pickup. In case of unexpected problems: Place the dewar in the…

Accelerator Development Group

…collaboration with the Operations, RF, and Engineering Groups at MAX IV as well as with the Division of Synchrotron Radiation Research and with the Faculty of Engineering at Lund University. The group is involved…

Sample Environments

…team, from left – Christopher Ward, Artur Domingues, and Stefan Carlson.   Stefan Carlson Scientist E-mail: Stefan.Carlson@maxiv.lu.se Phone: +46462223844 Artur Domingues E-mail: Artur.Domingues@maxiv.lu.se Christopher Ward Research Engineer E-mail: Christopher.ward@maxiv.lu.se Phone: +46462224954…

Fast Access

The beamline provides three types of the fast access: Sample or technical feasibility study (FS) Scientific experiment (SE) The maximum number of shifts: 6 (24 hrs). Please submit a request…

CoSAXS Detectors

…Specification for Eiger2 4M SAXS detectorNumber of detector modules 2 x 4 Sensitive area (width x height) [mm²] 155.1 x 162.2 Pixel size [µm²] 75 x 75 Total number of…

Data access

…are stored in /data/visitors/formax/#Proposal/#Visit/raw/. Reduced files are stored in /data/visitors/formax/#Proposal/#Visit/process/azint/. Each scan will be saved with the name scan-####.h5, where #### is a sequential number. The users need to keep…

FAQ

…record, how long you will be exposing at each measurement position and how much time is used for moving between measurement positions. number of measurement positions: For a simple mapping…

User information

number of participants in the experiments and the samples used. Samples need to be declared two weeks in advance, except non-hazardous samples, which can be declared up to three days…