Simulation and Design
The optical layout of beamlines at MAX IV are typically designed in close collaboration with our optics simulation experts. MAX IV uses a number of simulation tools to perform ray…
The optical layout of beamlines at MAX IV are typically designed in close collaboration with our optics simulation experts. MAX IV uses a number of simulation tools to perform ray…
…the Novo Nordisk Foundation under the grant number NNF17CC0030666” Call for proposals Spring 25 For more information, see MicroMAX User Information Beamline documents Macromolecular Crystallography Review Report (download PDF) https://www.youtube.com/watch?v=NT_LvrNkw0U…
…NOTE: Results from MicroMAX, in addition to the general acknowledgement for MAX IV, must include the following acknowledgement: “MicroMAX is funded by the Novo Nordisk Foundation under the grant number…
…keV. DetectorEIGER2 X 4MLambda 3M “windmill” Usage SAXS WAXS Number of pixels 4M 3M Sensor size (h x v) 2068×2162 pixels 4x512x1536 pixels Pixel size (h x v) 75×75 µm2…
…and the transition metal L resonances. To achieve high energy resolution the instrument is fairly large (a total length of approximately 10 m), and to achieve high momentum transfer resolution…
…software, hardware, etc. Stationing of personnel at the beamline (e.g., a postdoc) for part of the proposal period is highly encouraged. The LTP must be discussed with the beamline team…
…images (high-res for print and low-res for web) can be downloaded from Lund University’s media bank. Click “login as non-employee”. Go to MAX IV’s image bank Logos Download folder with…
…performance. Carbone et al., Journal of Synchrotron Radiation (2022), for the design of the diffraction endstation. Experimental data download Data can be downloaded either using Globus, or via normal sftp….
The endstation can house a cylindrical microjet setup designed to operate at ambient pressure conditions (up to 30 mbar): Precice control of pumping speed is available to control the pressure…
The access mode is only available for the Solid-State End Station. Maximum 6 shifts (24 hrs) can be allocated for a single proposal. A fast-access proposal can only be scheduled…