Our Activities

The main tasks of the vacuum team include: Conceptual design, procurement, test, installation and commissioning of vacuum related accelerator upgrades. Assistance with the design and implementation of new vacuum beamline…

Electron Spectroscopy

…mirror analyzers (as at both permanent endstations at FlexPES), or by measurement of the time of flight of the electrons (as will be used with the mobile ICE endstation). Here…

Imaging station

…beamline design allows to freely choose the degree of coherence in the probing beam, facilitating coherent diffraction imaging methods. These allow to measure the complex transmission function of the sample,…

Northern Lights on Food – Masterclass III

…from production to consumption. The masterclass is organized with funding support from Tillväxtverket, Vinnova, EU Regional Development Fund, Region Skåne and LINXS, and is free of charge. Date: August 29-September 2, 2022 Application deadline:…

Insertion devices

…tool to meet the tight requirements of the MAX IV accelerators on the ID’s field quality. The magnetic measurements systems consist of the following; Hall probe bench which covers 5.5…

User information

…experiment. It takes at least a shift (four hours) to set up a new experiment, depending on the complexity of the experiment. For combined in-situ full-field tomography and SWAXS experiments,…

Design Office

…designs concerning the demands put on them in terms of stability, alignment and that it physically matches the environment they are connected to or placed in. The Mechanical Design Team…

Inspecting Processing Results using EXI

…experiment, use the corresponding tabs to see the results of the scan analysis. To the right of the default of the Data collection list view is the Summary view, using…