Our Activities

The main tasks of the vacuum team include: Conceptual design, procurement, test, installation and commissioning of vacuum related accelerator upgrades. Assistance with the design and implementation of new vacuum beamline…

Electron Spectroscopy

…figure the red and blue-colored trajectories are for electrons with lower and higher kinetic energies, respectively. After traveling through the hemisphere, the electron is detected with a position sensitive detector…

Imaging station

…summer 2023 the vacuum microscope and the flight tube have been installed and are ready for user experiment at room temperature. The liquid nitrogen cooling will the installed and commissioned…

Northern Lights on Food – Masterclass III

…Regional Development Fund, Region Skåne and LINXS, and is free of charge. Date: August 29-September 2, 2022 Application deadline: is August 15 Location: Lund To apply and for more information, please read here!…

Insertion devices

The insertion Devices (ID) group is responsible of design, development and operation of Insertion Devices for the different beamlines at MAX IV Laboratory. Each beamline is fed by insertion device,…

User information

…down any issues with beamline control system or equipment. Pictorial logs and screenshots are strongly recommended to be documented in Elogy. After beamtime: Copied data, analysis scripts (if needed), Elogy…

Design Office

…designs concerning the demands put on them in terms of stability, alignment and that it physically matches the environment they are connected to or placed in. The Mechanical Design Team…

Inspecting Processing Results using EXI

…chevron_right If you would like to look at the results on disk, change the directory to /data/visitors/biomax/’proposal’/’date’ or /data/proprietary/biomax/’proposal’/’date’ (for proprietary proposals) . This directory should be visible to any…