STM sampleholders and sample mounting

…SPECS, etc) flat flag-type sampleplate. A number of these sampleplates (stainless steel or molybdenum for high temperatures) is available for users. The samples may be glued to the sampleplate using…

User information

…6 days). When considering time needed for experiments, it is recommended to apply either for long experiments (36 or 30 shifts = 6 or 5 full days) or short experiments…

Beamline development collaborations

…Denmark (DTU), and Copenhagen University (KU). The first step towards realizing a beamline dedicated to studying “real materials under real conditions in real time” was an infrastructure grant of 35…

WiFi

There are a number of wireless networks on-site. Here is some information on the differences between the different networks. Available Wireless Network SSIDs maxiv_user Intended for use by visiting scientists…

HPC Basics

…is a small cluster that can be used outside beam time by both staff and users. The front end is offline-fe1. The offline cluster is not accessible from the beamline…

IT Environment at BioMAX

…shared resources. There are limits to the maximum number of users who can log in at one time. Therefore, please log out always when you have finished working. There is…

MAX IV’s role in the Government’s Research Bill

The Government asks a number of referral bodies, including universities, government agencies, and other organisations, to give input and suggestions to their proposed research and innovation politics. Here is a…

Beamline optics

…(not yet in operation). For the approximate flux emitted from the undulator, see figure below: Theoretical integrated central-cone flux versus x-ray energy. A number of insertion device gaps are specified…