The Technical Infrastructure team is part of Engineering II and is in charge of Cooling, Ventilation, Compressed air, Cryo and gas systems.
The team supports the entire MAX IV laboratory with design, installation and operation of different equipment such as cooling units, ventilation, gas cabinets.
The team is also supporting Facility Manager with ventilation and cooling coordination from external provider to MAX IV Laboratory.