Calls

…call was open between 1st of September 2023 and 31st of October 2023, corresponding to a four-year employment period between 1st of March 2024 and 28th of February 2028. The…

Acknowledgement and References

…P., Hoh, S. W., Hough, M. A., Jenkins, H. T., Jimenez, E., Joosten, R. P., Keegan, R. M., Keep, N., Krissinel, E. B., Kolenko, P., Kovalevskiy, O., Lamzin, V. S.,…

Organization

…grant from the Knut and Alice Wallenberg Foundation in collaboration with the Swedish research universities Lund University, Chalmers University of Technology, Karlstad University, Karolinska Institutet, KTH Royal Institute of Technology,…

Governance

MAX IV Laboratory is a Swedish national laboratory hosted by Lund University (Swedish Code of Statutes SFS 1994 946 / SFS 2011 1567). Lund University is the legal entity of the laboratory. The…

Interim Science Director Joachim Schnadt begins at MAX IV

…paving a path to begin work at MAX-lab. Much of Joachim’s work has been with synchrotron-based electron spectroscopies and instrument and method development, including the goal APXPS system he envisioned,…

History

…construction of a national synchrotron light source to the relevant organisation at the time, the Swedish Council for Science Research (NRF). 1980 The Northern Apparatus Hall located inside the M…

Accelerator Documentation – peer reviewed articles

…pages 652-656 H. Tarawneh, E. Wallén http://dx.doi.org/10.1016/j.nima.2004.05.030 MAX-IV lattice, dynamic properties and magnet system Nucl. Instr. and Meth. A 508, 2003, pages 480-486 H. Tarawneh, M. Eriksson, L-J. Lindgren, B….

Optics

…the two KB mirrors have been published by Johansson et al. (2021). The high precision alignment procedure for the KB mirror system has been published by Kahnt et al. (2022)….

Beamline optics

…over the entire energy range. The monochromator has 3 additional gratings which are now starting to leave the commissioning phase and are available on request: 92 L/mm (cPGM) for higher…