History

…opens on 22 November. 2011 Construction starts on MAX IV. The first beamline programme is launched. 2015 Construction is completed and the tenant, Lund University, starts to move in. 2016…

Diffraction station

Sample Area Hutch Diffraction station parameters Photon energy 5-28 keV Routine operation 8-15 keV Focal spot size 50 – 200 nm Measured: 98 nm at 8 keV, 62 nm at…

Preparation lab

…x 1920 Size (calibrated) 4.5 mm x 3.4 mm Lenses properties MPLAPO 2.5x/0.08 – working distance 10700 µm MPL-BD 10x/0.25 – working distance 7000 µm LMPLFLN-BD 20x/0.40 – working distance…

Experimental station

…Characterization RGA (MKS, Microvision 2) LEED (Specs, ErLEED 3000D) Sputter gun available (Varian, 981-2043) Metal evaporator available (Focus GmbH, EFM 3) Dosing two leak valves are mounted on CF40 flanges,…